AIP Les sites miniers illicites, « hauts lieux » de la propagation du VIH Sida dans le département de Séguéla (Préfet) AIP Un fonds de 20 milliards pour le développement des PME ivoiriennes AIP Côte d’Ivoire-AIP/ Economie bleue : Vers l’élaboration d’un projet banquable pour la région des Grands Ponts AIP Côte d’Ivoire-AIP/ Journée mondiale du Sida : la population de Transua invitée à se faire dépister AIP Un responsable de la société civile de Bondoukou donne des solutions pour le maintien d’une paix durable en Côte d’Ivoire AGP Gabon: Des tests d’orientation des nouveaux bacheliers 2020 à partir du 07 décembre prochain AGP Gabon: La bonne gouvernance et la lutte contre la corruption évoquées en conseil de cabinet à la Primature AGP Journée mondiale de lutte contre le Sida : 51.000 personnes infectées pour 26.000 sous traitement au Gabon APS PLUS DE 50 MILLIARDS POUR LES PÊCHES ET L’ÉCONOMIE MARITIME EN 2021 ANP Télévision Numérique Terrestre au Niger : Lancement à Tillabéri d’une campagne nationale de sensibilisation

Otordjor will benefit from Greater Accra Resilient Project – Usurla


  26 Octobre      13        Société (25514),

   

Accra, Oct.26, GNA – Mrs Ursula Owusu Ekuful, Minister of Communication and Member of Parliament (MP) for Ablekuma West Constituency has said plans were far advanced to include Otordjo, an Accra suburb, in the Greater Accra Resilient project.

“If you were not in the plan sometime back, then, I assure you that you are in the plan now with your own electoral area,’’ the MP said.

The Greater Accra Resilient and Development project is expected to improve flood risk and solid waste management in the Odaw River Basin of the Greater Accra Region, and improve access to basic infrastructure and services in the targeted communities within the Odaw River Basin.

Mrs Ekuful said this when she engaged the community members on development issues including; sanitation, flooding and security.

The MP said surveyors would be needed to demarcate and clear structures on waterways for the project to end the perennial flooding in the community.

‘’I understand your plight and I’m pleading with you to be patience with us, we are resolute to solve the problem and put smiles on your faces,’’ she said.

Mr George Cyril Bray, Ablekuma West Municipal Chief Executive, said
“The area did not have a layout” and called for support from the community to re-plan the area for rapid socio-economic development.

Dans la même catégorie