APS SENEGAL-ECONOMIE / Un comité régional de pêche artisanale mis en place à Louga – Agence de presse sénégalaise MAP La 20è Conférence arabe des chefs des autorités de la circulation, le 08 mai à Tunis MAP Le Maroc participe au Caire au Forum arabe sur le renforcement des efforts de lutte contre la corruption APS SENEGAL-COTEDIVOIRE-POLITIQUE / Bassirou Diomaye Faye sera à Abidjan, mardi APS SENEGAL-AFRIQUE-SECURITE / Des officiers de seize pays du Golf de Guinée outillés en matière de cybercriminalité en milieu maritime MAP Sénégal: le Premier ministre Ousmane Sonko démissionne de son poste de maire de Ziguinchor (officiel) MAP Afrique du Sud: un ouvrier tué et 22 autres secourus dans l’effondrement d’un immeuble en construction (autorités) APS SENEGAL-SANTE-CLIMAT / Le changement climatique, plus grand défi sanitaire contemporain (sage-femme) APS SENEGAL-AFRIQUE-BASKET / BAL : l’AS Douanes domine US Monastir et se relance APS SENEGAL-CULTURE / Itinéraires artistiques de Saint-Louis : le commissaire de l’exposition salue la visibilité offerte aux artistes

Court convicts driver for building without permit


  22 Juillet      21        Société (45234),

 

Hohoe (V/R), July 22, GNA -A Hohoe Magistrate Court has sentenced Paul Abu, a driver, to a fine of GH₵1,200 for building a house without a development permit.

Abu, who pleaded guilty was convicted on his own plea, and would serve six months imprisonment if he defaults in the payment of the fine.

Mr. Frank Azila-Gbettor, Chief Environmental Health Assistant at the Hohoe Municipal Assembly, prosecuting, told the Court presided over by Mr. Peter Anongdare that the Assembly’s Development Control Taskforce on their routine rounds sited a project started by the convict behind Star Oil Fuelling Station, Gbi-Bla, without development permit.

He said the convict was advised to stop work, demolish the structure, and to obtain a permit.

He said the convict was refused permit on April 12, 2019, on the basis that the Technical and Spatial Planning Committee of the Assembly had taken decision not to approve any development permit in water-logged areas in the Municipality.

Mr. Azila-Gbettor said Abu refused to comply with the directives of the Committee to break down the structure but rather continued to work on it.

The Prosecutor said the task force on January 22, this year, visited the site to issue a final warning notice for the demolishing of the structure, which he failed to comply with.