APS SENEGAL-AFRIQUE-DEVELOPPEMENT / L’UA tire le bilan de la première décennie d’exécution de son Agenda 2063 APS SÉNÉGAL/SPORTS/LUTTE / Drapeau du Chef de l’État : une 24ème édition sous le signe de la culture MAP Tanger: Ouverture du Congrès des 70 femmes d’expertise d’Afrique MAP Air Côte d’Ivoire inaugure mardi prochain sa liaison directe entre Casablanca et Abidjan APS SENEGAL-COTEDIVOIRE-COOPERATION / Abidjan et Dakar en ”convergence totale” de vues, assure Alassane Ouattara APS SENEGAL-AFRIQUE-DIPLOMATIE / Bassirou Diomaye Faye évoque le rôle moteur du Sénégal et de la Côte d’Ivoire dans l’intégration régionale APS SENEGAL-ENVIRONNEMENT-ECONOMIE / Code des marchés publics : des gestionnaires du ministère de l’Environnement formés sur les nouvelles dispositions MAP L’exposition « Bamako Dreams 30 », une riche mosaïque de la créativité contemporaine africaine APS SENEGAL-MIGRATION-DIVERS / Saint-Louis : une pirogue transportant 67 candidats à l’émigration irrégulière interpellée (Marine nationale) MAP Le financement climatique ne doit pas aggraver la dette des pays africains (rencontre)

Seven Communities in Ellembelle Connected to National Electricity Grid


  20 Novembre      30        Société (45243),

 

Aidoo-Suazo(W/R),Nov 20,GNA-The Member of Parliament(MP) for Ellembelle, MrEmmanuel Armah-Kofi Buah has supported the connection of seven communities to the national electricity grid in his constituency.
The connection, which is under the Rural Electrification Project (REP) is to boost social and economic activities of the people.
The predominantly cocoa- growing communities are; Ewerekokrom, Boahenekrom, Kwasikrom, Adjeikrom, Aidosuazo, Muntakwa and Santaso.
The Rural Electrification Project, was started by Mr. Kofi-Buah then Energy Minister in 2016, but stalled immediately the NDC government left power.
However, early this year Mr. Kofi-Buah located the contractor and paid the expenses involved for the completion of the project.
So far, 16 communities in the Northern part of the District now enjoy electricity through the instrumentality of Mr. Kofi-Buah.
Speaking at separate ceremonies to commission the project, Mr. Kofi-Buah thanked God for protecting the contractors and offering them the opportunity to carry electric poles through the forest to complete the project timely.
The MP acknowledged the role of people in those communities as they produced a chunk of Ghana’s Cocoa adding, that the road network would be fixed to enable them cart their cocoa to the Produce Buying Center(PBC).
The former Energy Minister advised them to make good use of electricity and conserve power adding that other major projects pencilled down would be executed after the December 07 elections and asked them to retain him and the NDC in power.
The Odikro of Aidosuazo, Nana John Aidoo expressed his gratitude and asked God to bless Armah Kofi-Buah for changing their lives.
« We have been in darkness for so many years, but today Armah Kofi-Buah has brought electricity here, we thank him, may God bless him in all his endeavours as for us we are rallying behind him until he becomes President of Ghana », he said.
He recalled that, « before today we have been traveling to far places to charge our phones, but today we will not travel anymore. Today we can drink iced water, we can preserve our fish here, this electricity is a blessing for us and everybody here is happy, God bless Armah Kofi-Buah ».
Mr.Amin Adams, the Foreman of Technology Management Group (TMG) who completed the project, expressed his happiness over the completion of the project.
He admitted that when they started the project in 2016, they had to stop the work due to some circumstances, but thanked Armah Buah for bringing them back to site to complete the project.
The Chief and people of Aidoo-Suazo presented a ram and foodstuffs to the MP in appreciation of his good work.
GNA

Dans la même catégorie