MAP Niger: Des mines d’or temporairement fermées suite à la mort de plusieurs animaux APS SENEGAL-MONDE-DIPLOMATIE-MEDIAS / L’APS a signé une convention de partenariat avec le département Information de l’OCI APS SENEGAL-AFRIQUE-CINEMA / Festival FFA : le film ‘’Goodby Julia’’ remporte le prix du meilleur long métrag APS SENEGAL-SOCIETE-GENRE / 50% des femmes victimes de VBG en milieu professionnel (étude) AIP Une quarantaine d’enfants prennent part à la compétition des jeux d’échec à l’ambassade de l’Inde en Côte d’Ivoire MAP Banjul: Le Sommet de l’OCI souligne l’importance stratégique de l’Initiative de SM le Roi pour les « États Africains Atlantiques » MAP Banjul : Le Sommet de l’OCI salue les initiatives du Maroc sur les plans régional et multilatéral MAP Banjul : Le Sommet de l’OCI souligne son rejet total des plans séparatistes visant à porter atteinte à la souveraineté des États MAP Gambie: clôture du 15ème Sommet de l’OCI avec l’adoption de la Déclaration de Banjul ANP Début à Banjul en Gambie des travaux du 15ème Sommet de l’OCI

Kpone taxi drivers threaten demonstration over Michel camp Calypso road


  21 Juillet      20        Société (45222),

 

By Isaac Newton Tetteh GNA

Saki(GAR) July 21, GNA- Taxi drivers plying the Kpone Calypso to Michel Camp road have threatened to demonstrate against authorities over the deplorable state of the road.

Speaking to the Ghana News Agency, Mr Rexmond Ntiamoah, Chairman of the local taxi drivers association, stated that, all available avenues to get authorities to fix the road have been exhausted
and the only option left was to demonstrate.

Mr. Ntiamoah stated that authorities such as the Kpone Katamanso Municipal Assembly and the Urban Roads Department had ignored their call to get the road fixed.

According to him , proceeds made from driving was used in fixing their cars which got damaged on daily basis due to the deployable nature of the road, a situation he said, constantly resulted in confrontation between drivers and their employers.

The chairman explained that, prices of car parts were skyrocketing on daily basis and, « We are really suffering. »

Mr. Anthony Nukpenu ,former Presiding Member, Kpone Katamanso Municipal Assembly, in an interview with the GNA noted that, the 4.7 kilometer road was awarded on construct to Queiroz Galvao, a Braizalian construction firm by the last NDC government.

He added that the contractor was able to construct only 2 kilometers with asphaltic overlay leaving the remaing 2.7 kilometers in such a deployable state.
Efforts made to get the Municipal road engineer respond to the issues was unsuccessful.

Dans la même catégorie